Selected projects from the Capital Division of the San Francisco Recreation and Park Department, where Warwin C. Davis served as a project manager. The work spans park and shoreline planning, access and mobility, facility design, permitting, funding materials, and team development.

Work 01 / 2023–2024

Irish Famine Memorial

Setting a commemorative work within an accessible public landscape.

Location
Lincoln Park
Focus
Memorial site planning
Work
Concept design deck · 3D mock-up · ADA accessibility studies · 60% construction documents · Geotechnical report coordination · CEQA exemption · Arts Commission review

The Irish Famine Memorial is planned for a trail intersection along El Camino del Mar in Lincoln Park, with a view toward the Golden Gate Bridge. A community committee initiated it to remember the victims and survivors of the Great Famine of 1845–1852 and to connect San Francisco’s Irish American community with its immigrant roots. The first phase is a concrete plaza with a guardrail, designed as a platform for interpretive elements and a commemorative sculpture.

The design work carried the memorial from first concept through a 60% construction document set. A concept design deck laid out the commemorative idea for stakeholders, and a three-dimensional mock-up in Rhino tested the memorial elements, interpretive panels, and plaza in their landscape. Accessibility shaped the layout: ADA studies resolved the approach from nearby streets and trail routes into the plaza, and those updates were carried through the site plans.

The 60% set included cover sheets, site plans, elevations, sections, and landscape drawings. Alongside the drawings came preparation and review of the geotechnical report, the CEQA exemption application, and coordination with the Arts Commission on art enrichment review, with the Recreation and Park Director, with the Department of Public Works, and with the Irish community organization behind the project.

Work 02 / 2022–2024

India Basin Shoreline Park, Bay Trail & Funding

Bringing shoreline restoration, public access, and funding work into one program.

Location
Bayview–Hunters Point
Focus
Waterfront delivery, trail access and funding
Work
Capital project management · Grant applications · Environmental review and permitting · Community engagement · Design management · Topographic and deed-restriction mapping · Construction oversight

India Basin Waterfront Park joins a former industrial site at 900 Innes Avenue with the existing India Basin Shoreline Park to create a single park of roughly ten acres on San Francisco Bay. The 900 Innes phase replaced a vacant industrial lot with gardens and green space, about 5,500 square feet of new wetland habitat, tidal marsh, some 483 linear feet of living shoreline, a public plaza, accessible pathways, a floating dock, viewing areas, and a half-mile segment of the San Francisco Bay Trail, connecting the Bayview–Hunters Point neighborhood directly to the water.

The work spanned the full capital project lifecycle: grant applications, community engagement, environmental review, design management, and construction oversight. Design iterations and community programming decks, versioned from January through April 2023, kept residents and partner organizations looking at the same evolving plan. Topographic survey mapping and block-specific base maps (blocks 4606, 4622, 4630, 4645, and 4646) gave the design team a common footing, and EPA deed-restriction overlays for those five city blocks, issued through several revisions, mapped the limits that govern where and how the site can be built. Food-truck programming elements were designed alongside the park.

The Bay Trail segment was developed with The Trust for Public Land, the State Coastal Conservancy, the San Francisco Bay Trail program, and regulators including the Army Corps of Engineers and the Regional Water Quality Control Board. Alignment overlays, existing-conditions photography, habitat maps, and a habitat study process placed the trail so that public access and habitat improvements reinforced each other, with site plans integrating the trail with existing wetlands and the shoreline.

Funding ran in parallel with design. Applications and supporting materials were prepared for the State Coastal Conservancy, the Habitat Conservation Fund, and the federal Land and Water Conservation Fund, including boundary mapping, landscape plans, and presentation decks, along with letters of support from more than a dozen community organizations, among them the A. Philip Randolph Institute, the San Francisco Parks Alliance, and The Trust for Public Land. Coordination reached across more than fifteen consultant disciplines and 39 regulatory agencies.

Work 03 / 2023

Boeddeker Park

Testing a clearer, more welcoming park edge.

Location
Tenderloin
Focus
Park edge and circulation
Work
Fence-line design options · 3D site model · Presentation plans for commission review · Stakeholder review

Boeddeker Park sits in the dense Tenderloin, where open space is scarce. Before its rebuild, fences ringed and divided the park, blocked views in and out, and gave it an unwelcoming reputation. The renovation, led by The Trust for Public Land with the Recreation and Park Department, reopened it in 2014 with a clubhouse, play area, basketball court, and a far more open layout.

A 2023 study returned to the question that most shapes how a park feels from the street: where the edge sits. Four fence-line options (1.0, 1.1, 2.0, and 2.1) were developed as layered graphics showing fence placement, planting strips, seating areas, and pedestrian paths, each tested against sight lines, accessibility, drainage, and maintenance access.

A three-dimensional site model built in Rhino captured the existing topography and context, so reviewers could see each option in place before choosing a direction. The options were refined through review cycles with stakeholders in early January 2023 and assembled as presentation plans for the Recreation and Park Commission.

Work 04 / 2021–2022

Noe Valley Town Square Restrooms

Fitting a needed public facility into a well-used civic space.

Location
Noe Valley
Focus
Feasibility and site preparation
Work
Feasibility study · Site preparation and site plans · Siting and massing options · Stakeholder coordination

Noe Valley Town Square, on 24th Street between Sanchez and Vicksburg Streets, is the central gathering place for the neighborhood. A restroom was part of the square’s 2014 concept plan but was set aside when funding fell short, and neighbors kept asking for one.

The work covered the project’s feasibility phase and the site preparation that came with it. Feasibility asked where a restroom could sit on a busy, well-loved square and what would constrain it: existing utilities, drainage patterns, ADA accessibility, and the relationship to the surrounding landscape. A series of options explored massing, site placement, and architectural character, developed in coordination with the Noe Valley Civic Association and the Recreation and Park Department.

Site preparation gave those options a firm footing: site plans and a three-dimensional model of the square placed each option in context, so stakeholders could compare them and the project could move into design with a clear understanding of what the site would allow.

Work 05 / 2023–2024

Kelloch & Velasco Park Fitness

Making outdoor fitness equipment work as part of the park.

Location
Visitacion Valley
Focus
Outdoor fitness planning
Work
Site assessment · Equipment layouts in AutoCAD and Rhino · CEQA application · Cost estimate and take-off · Commission presentation · Construction administration and closeout

Kelloch & Velasco Mini Park is a small neighborhood park in Visitacion Valley with a gazebo, benches, and public basketball courts. The project added a new program to it, adult outdoor fitness equipment, without crowding what neighbors already use.

The work ran from site assessment through final design. Adult fitness equipment from KOMPAN was specified and positioned for accessible reach, clear circulation, and safe use zones, with surfacing requirements built into each layout. Three layout options (Options 1, 1.2, and 2) were developed in both AutoCAD and Rhino, so the same design could serve plan review and three-dimensional study.

Environmental review and cost followed the design: a CEQA application supported by site photographs and existing-conditions documentation, a cost estimate, and a materials take-off, along with a design presentation for commission review. Once in construction, the work extended to construction administration through OAC meetings and contract closeout.

Work 06 / 2023–2024

Jefferson Square Paths

Turning a maintenance need into a coordinated path package.

Location
Western Addition
Focus
Path renewal
Work
Scope and budget development · Site, grading, and detail drawings · Specifications · Signage design · CEQA exemption · Community and OAC meetings

Jefferson Square is a hillside neighborhood park in the Western Addition with benches, a dog play area, restrooms, and views. On a sloped site, worn paths are more than a surface problem: grade, drainage, and retaining conditions all affect whether a route is safe and accessible.

The scope combined asphalt paving, path repair, drainage improvements, retaining-wall work, and new signage into one design, developed from concept through a full set of construction documents: site plans, grading plans, specifications, and construction details. The drawings moved through four phases of revision in AutoCAD and Rhino as scope, budget, and field conditions were refined.

Scope documentation and a master budget gave the work a defined cost basis, and the CEQA exemption application was prepared alongside the design. Community meetings and OAC meetings kept neighbors and project stakeholders involved, and signage was integrated into the package to give the paths wayfinding and interpretive information.

Work 07 / 2022–2024

McLaren Park Trees & Trails

Coordinating tree work and trail access across a large park.

Location
McLaren Park
Focus
Tree and trail coordination
Work
Site and tree assessment · Zone planning · Site logistics plans (V1.0–V3.0) · Roles and responsibilities matrix · Bid award and construction oversight

John McLaren Park is one of San Francisco’s largest parks, with extensive stands of trees, including blue gum eucalyptus planted densely in the early 1900s. The McLaren Trails Priority Improvements program combines trail upgrades, new accessible paths, and restoration of natural features. Tree work came first: roughly 400 trees across four priority areas, the Upper Reservoir, Shelley Inner Core, University Hill, and Visitacion Avenue, were planned for pruning or removal for safety, habitat, and trail conditions, with a commitment to replant.

The work started with site assessment and a tree inventory, then moved into zone planning and the design of site logistics for Zone 2. Tree risk assessment, species identification, and preservation recommendations were tied to trail alignment and circulation, so that protecting trees and improving trails supported each other.

Site logistics plans, developed through three versions, showed temporary work zones, equipment staging areas, and phased implementation. A roles-and-responsibilities matrix coordinated the Recreation and Park grounds division, contracted arborists, construction teams, and community stakeholders, while OAC meetings and site visits kept everyone aligned through the bid award and construction oversight.

Work 08 / 2024

Twin Peaks Local Access & Mobility

Studying safer movement at a steep, heavily visited landscape.

Location
Twin Peaks
Focus
Pedestrian access study
Work
Existing-conditions base files · Pedestrian circulation and ADA concepts · NEPA application · Planning Department coordination · Design presentations

Twin Peaks is a prominent public viewpoint where steep terrain and heavy visitation meet a residential neighborhood. Reaching the top on foot, by transit, or with a mobility device is difficult, and nearby residents have raised concerns about parking and noise.

The access study looked at the full route to the summit: ADA-accessible connections, ramps and curb cuts, seating and rest areas along steep paths, wayfinding, and the link to the transit stop at the peak, all while preserving sight lines and the character of the landscape.

Illustrator base files captured existing conditions and the proposed improvements, backed by site photography and survey documentation. The work was coordinated with the Capital Development team and the Planning Department, and included preparation of the NEPA application and supporting design documents.

Work 09 / 2023

JFK Drive Striping & Utilities

Clarifying movement and service needs in a busy park corridor.

Location
Golden Gate Park
Focus
Circulation and utilities
Work
Striping layouts · Base-layer and utility drawings · Specifications and bid documents · Interdepartmental coordination

JFK Drive is a central road through Golden Gate Park. In 2023 the Recreation and Park Department began converting it into JFK Promenade, a space for people walking, biking, and rolling, and removed outdated lane, bicycle, and accessible-parking striping along the stretch between Kezar Drive and Transverse Drive.

Changing a corridor like this takes more than paint. The work translated the change into drawings: striping layouts, base-layer files, and utility plans showing how pedestrians, bicycles, service vehicles, and event movements would share the space, and how the new layout met the utilities beneath and beside the roadway.

Construction specifications and bid documents supported the work, and the design was coordinated across Recreation and Park maintenance staff and the Department of Public Works.

Work 10 / 2023

India Basin Tech Hub Permitting

Organizing drawings and reviews for a community-serving facility.

Location
Bayview–Hunters Point
Focus
Permit coordination
Work
Building permit applications · Site plans and construction documents · Agency review responses · Permit set revisions

The Community Innovation Lab grew out of the park’s Tech Hub, which since 2021 has offered neighbors free Wi-Fi, laptop and tablet lending, and technical support. Built around a refurbished shipping container with a deck and patio, the Lab expanded those services and added free sports and activity equipment rentals and space for community organizations to host programs and workshops. It opened in October 2023.

Before it could open, the facility had to be translated into reviewable site and building information. Building permit applications, site plans, and construction documents were prepared for the 36-by-24-inch permit submittals, showing access routes, utility connections, construction staging areas, and the final site layout.

The permit process ran through several agencies at once: the Planning Department, the Department of Building Inspection, the Recreation and Park Department, the Arts Commission, Public Works, and the Department of Technology. Agency comments and requests for information were answered through revised permit sets, and the final permit sets were submitted on June 2, 2023.

Work 11 / 2025

Sava Pool Exterior Renovation

Restoring a neighborhood pool building so it stays dry and open.

Location
Parkside
Focus
Building enclosure repair
Work
Project management · Architect and engineer coordination · Construction sequencing · Public updates

Sava Pool is the indoor public pool at Larsen Park in the Parkside neighborhood. Water had been working its way into the building’s exterior, and the project restores the building envelope to stop it. On the west facade, the existing tile is removed, a waterproofing membrane is installed, new cement plaster goes on, and the tile is reapplied, with new flashings at the openings. Smaller repairs on the north and south walls seal joints and reinforce the upper tile corners.

The Recreation and Park Department leads the project, with architectural and engineering services from McGinnis Chen Associates. Management of the work centers on coordinating the design team and the contractor and on sequencing construction around an active facility, so that scaffolding and repair work proceed without disrupting the pool’s posted schedule.

Construction began in October 2025 and was expected to run into early 2026, with project updates shared publicly for the people who use the pool.

Work 12

Sharon Art Studio ADA Improvements

Opening a historic public art center to everyone who wants to make something there.

Location
Golden Gate Park
Focus
ADA accessibility
Work
ADA accessibility improvements · Project management · Design and construction coordination

Sharon Art Studio is San Francisco’s largest public art center, housed in a historic building at Robin Williams Meadow in Golden Gate Park and operated jointly by the Recreation and Park Department and the Friends of Sharon Art Studio. Ceramics, glass, jewelry, drawing, and painting classes serve youth, teens, adults, and seniors across several levels of the building.

The project centered on ADA accessibility. In a historic building with studios on different levels, access is a design question as much as a code requirement: how people arrive, reach each studio, and move through the building. The accessibility work was carried out with the Recreation and Park Department and the studio so that its classes and programs remain open to everyone.

Work 13 / 2023–2024

Capital Team Summer Intern Program

Building a more consistent path into public capital-project work.

Location
San Francisco
Focus
Public-sector team development
Work
Program design · Application screening and scoring · Interview coordination · Training materials · Evaluation reports

The Capital Team Summer Intern Program gave students interested in design, planning, and public project delivery a structured introduction to capital-project work: project management, site planning, design development, and stakeholder coordination.

The program was built from the ground up. Requirements for student design trainees came first, followed by standardized evaluation rubrics and a scoring card developed in Python so that every candidate was rated the same way. More than 200 applications across the Capital and Planning teams were screened, scored, and moved through interviews coordinated with the project teams.

Training materials for participants and evaluation reports for the program closed the loop, creating a repeatable pipeline between academic programs and the Recreation and Park Department’s capital work.

Project inquiry